New Construction Costs SOP

By: Environmental Health & Safety on

A new Standard Operating Procedure has been created for all UCF vendors, contractors and their subcontractors working on university-owned spaces, please download the new Construction Costs SOP.

Share This Article

Featured Content image

Lab Coat Dispensers Now on Main Campus and Lake Nona

Lab coat dispensers and drop off machines are now available in Research 1, Engineering 2, Physical Sciences Building and BSBS at Lake Nona. Students, Staff and Faculty attached to a...

Read More

Featured Content image

Ergonomics for Working Remotely

Working remotely during this pandemic brings significant challenges. Finding a correct ergonomic set-up at home to do computer work for 8 hours (or more) per day is a challenge, but...

Read More

Featured Content image

Can a Mask Protect Me? Putting Homemade Masks in the Hierarchy of Controls

https://www.jhsph.edu/research/centers-and-institutes/johns-hopkins-education-and-research-center-for-occupational-safety-and-health/can-a-mask-protect-me-putting-homemade-masks-in-the-hierarchy-of-controls

Read More

Featured Content image

Novel Coronavirus (COVID-19) Information

Please see the following links for information regarding the Novel Coronavirus. https://www.ucf.edu/news/coronavirus-awareness-and-guidance/ https://www.ucf.edu/safety/coronavirus/ https://studenthealth.ucf.edu/coronavirus/ https://www.cdc.gov/coronavirus/2019-ncov/  

Read More